Actions-arrow-right-icon Sharm el Sheikh Congress Centre.

Actions-arrow-right-icon Movenpick Golf Resort, Jolie Ville Resort – Sharm El Sheikh

Actions-arrow-right-icon Movenpick Resort – El Qusseir

Actions-arrow-right-icon Movenpick Resort - Taba

Actions-arrow-right-icon Movenpick Hotel – Heliopolios
All these properties have BMS system Desigo Insight ( Total 8500 datapoints ) and Fire Alarm System as well as Fire alarm system Algorex/Analogue plus ( total 5400 fire alarm points and 9 CC1142 panels ) and SYNOVA ( 3000 Fire alarm points and 6 FC700 panels ) and 3 danger management systems ( MM8000 ).


Actions-arrow-right-icon Movenpick Golf Resort – Sharm El Sheikh

Desalinated water distribution network ( including metering and billing system ) In this Project Petrokima was the Main Contractor for electrical and light current works.


We Support

More than 20 years of successful cooperation resulted in a strong and reliable name with a reference list including some of the most prestigious projects successfully commissioned during this period . Contact Us...

Contact Us

Address: South Central Spine Building plaza 34, El Sheikh Zayed beside Zayed Hospital

+202 3851 5091 to 3851 5098 (10 lines)
+202 3851 7772 (Fax)


This email address is being protected from spambots. You need JavaScript enabled to view it.